AUTOR DO BLOG ENG.ARMANDO CAVERO MIRANDA SÃO PAULO BRASIL

"OBRIGADO DEUS PELA VIDA,PELA MINHA FAMILIA,PELO TRABALHO,PELO PÃO DE CADA DIA,PROTEGENOS DO MAL"

"OBRIGADO DEUS PELA VIDA,PELA MINHA FAMILIA,PELO TRABALHO,PELO PÃO DE CADA DIA,PROTEGENOS  DO MAL"

“SE SEUS PROJETOS FOREM PARA UM ANO,SEMEIE O GRÂO.SE FOREM PARA DEZ ANOS,PLANTE UMA ÁRVORE.SE FOREM PARA CEM ANOS,EDUQUE O POVO.”

“Sixty years ago I knew everything; now I know nothing; education is a progressive discovery of our own ignorance. Will Durant”

https://picasion.com/
https://picasion.com/

sexta-feira, 2 de abril de 2010

toroid coil winding (high speed)-ALTAS TRAFO

hıgh speed toroid coil winding (0.50 mm wire 1100 turn 150 Watt isolating toroid tranformer)

AC Magnetic and Thermal Analyses of a Three-Phase Transformer, using EMS in SolidWorks part 1 of 2

A part of the EMS Video Tutorial Series.

This tutorial shows the abilities found in EMS to solve AC magnetic problems coupled with thermal analysis. The subjects of interest are the magnetic flux density and the temperature distribution of this three-phase transformer. The first half of the tutorial focuses on the input and preprocessing phase.

Using the powerful EMS CAE solution fully embeded in Solidworks, electromagnetic and mechatronics field simulation of the most complex electromechanical designs has never been this easy!
EMS is a Certified Gold Product by SolidWorks.
EMS OEM comes with SolidWorks in one affordable package.
Visit: www.emworks.com to learn more.



Liebert NXL UPS Witness Test: Power Fault Tripping & Transfer

In the spring of 2009, Emerson Network Power invited groups of consulting-specifying engineers from around the country to the Liebert Adaptive Power Witness Test Center in Delaware, Ohio for an introductory demonstration of the new Liebert NXL 750 kVA UPS. Under the direction of the participating engineers, Emerson Network Power technicians ran a variety of tests on the Liebert NXL single-module units and units configured into a large multi-module system. In this test, a technician will trip the output of one module while in redundant operation.

sábado, 20 de março de 2010