AUTOR DO BLOG ENG.ARMANDO CAVERO MIRANDA SÃO PAULO BRASIL

"OBRIGADO DEUS PELA VIDA,PELA MINHA FAMILIA,PELO TRABALHO,PELO PÃO DE CADA DIA,PROTEGENOS DO MAL"

"OBRIGADO DEUS PELA VIDA,PELA MINHA FAMILIA,PELO TRABALHO,PELO PÃO DE CADA DIA,PROTEGENOS  DO MAL"

“SE SEUS PROJETOS FOREM PARA UM ANO,SEMEIE O GRÂO.SE FOREM PARA DEZ ANOS,PLANTE UMA ÁRVORE.SE FOREM PARA CEM ANOS,EDUQUE O POVO.”

“Sixty years ago I knew everything; now I know nothing; education is a progressive discovery of our own ignorance. Will Durant”

domingo, 14 de dezembro de 2014

HIGH FREQUENCY LINK UPS SYSTEM By Emad Abdulrazzaq Rasool School of Engineering and Design Department of Electrical Engineering and Electronics Brunel University UNITED KINGDOM






HIGH FREQUENCY LINK UPS SYSTEM
A thesis submitted for the degree of Master of Philosophy
 By Emad Abdulrazzaq Rasool
 School of Engineering and Design Department of Electrical Engineering and Electronics
Brunel University January 2013

ABSTRACT
The main aim of this thesis is to propose, design, simulate and build a new UPS system which can be used for compact applications. The idea of the proposed system is to operate the transformers within the UPS at high frequency so that the size and the weight are kept to minimum. In order to achieve this aim, the transformer within the UPS system is operated at high frequency; however it also carries two 50 Hz waveforms at 180 phase shift so that the transformer does not see this 50 Hz frequency. A cycloconverter is then used to reconstruct the 50 Hz waveform for the UPS output.
The UPS system is simulated using PSPICE software at high frequency link of 500 Hz, 1 kHz, 5 kHz and 10 kHz. The simulation results show that the transformer only passes the high frequency component while the 50 Hz frequency is ‘hidden’ within the transformer. The proposed UPS system is then built using MOSFETs IRF740 as the main switches for the inverter and cycloconverter circuits. A Chipkit-uno32-development-board is used to control the MOSFET switches. Simulated and practical results show the viability of the proposed UPS system.

LINK FULL THESIS
http://bura.brunel.ac.uk/bitstream/2438/7246/1/FulltextThesis.pdf

Nenhum comentário:

Postar um comentário